Supper fine high speed alloy double roller crusher for high end brick production

Supper fine high speed alloy double roller crusher for high end brick production

Supper fine high speed alloy double roller crusher for high end brick production

Raw material processing
In addition to higher raw material performance requirements, the one-time burning process also requires raw material processing, and the raw material particle gradation is more reasonable. For coal gangue or hard shale, although it is suitable to use the one-time burning process, if the raw material processing fineness is unreasonable. If the aging effect is not good, the forming of the bricks cannot be guaranteed. Strength of wet billet and drying effect. When the green body enters the drying kiln and heats up, it becomes soft and its strength decreases. The bottom body cannot withstand the pressure of the upper body and collapses. Therefore, the fineness of raw materials must meet: ∠0.5mm accounted for more than 55%, 05.mm-1mm accounted for 20%-25%, and 1mm-2mm accounted for less than 20%. The lower the plasticity index of the raw material, the higher the proportion of fines should be.

3. Molding workshop:including the feeding box, mixer, clay machine, extruder, cutting and transportation construction, as well as the kiln base after pouring belt,top car machine, tractor, kiln channel pavement, cushion and other construction.

4. The civil construction scope for air compressor stations, plumbing, substations, fire pump rooms, etc. includes drying kiln, roasting kiln, ferry car,hydraulic pusher,return tractor,traction machine, winch, tidal fan, blower, kiln cooling fan,pipeline , heat exchanger,kiln car production, track and so on.

Step 5:Preparation before production

1. organization construction

2. Make plans and regulations

3. Maintain and add equipment

4. Clean up the existing dry site and drying supplies

5. Maintain kiln

6. Maintain electrical equipment

7. Prepare sufficient fuel

8. Preparation of auxiliary items for production

9. Construct road and drainage

10. Prepare raw materials in advance

11. Ensure safety precautions

12. Run a test

13. Prepare spare parts

Write a Message

Your email address will not be published.

Related Posts